Phase 1

Results: 5201



#Item
201Manchester Metrolink / Greater Manchester / NUTS 1 statistical regions of England / Weaste / Eccles Line / City of Salford / Eccles Interchange / Salford /  Greater Manchester / Exchange Quay tram stop / MediaCityUK / Deansgate-Castlefield tram stop / Manchester city centre

Metrolink Eccles line rail maintenance works – summer 2016 Weaste Metrolink stop Phase 1 A major track replacement programme will see the Eccles via MediaCityUK Metrolink line temporarily close from Sunday 26 June. Tra

Add to Reading List

Source URL: www.transformationinformation.co.uk

Language: English - Date: 2016-08-04 12:33:11
202Metallurgy / Chemistry / Materials science / Matter / Isothermal transformation diagram / Austenite / Ferrite / Pearlite / Steel / Nucleation / Hardenability / Quenching

Scripta Materialia–935 www.actamat-journals.com Discussion to ‘‘Grain nucleation and growth during phase transformations’’ by S.E. Offerman et al., Science, 298, 1003 (November 1, 2002)

Add to Reading List

Source URL: www.tudelft.nl

Language: English - Date: 2016-08-05 09:43:08
203Electromagnetism / Electrical engineering / Engineering / Electric power conversion / Electric power / Transformer / Electric power distribution / Three-phase electric power / Power inverter / Power factor / Distribution transformer / War of Currents

1 Identifying Techniques, Topologies and Features for Maximizing the Efficiency of a Distribution Grid with Solid State Power Devices Karl Stefanski, Hengsi Qin, Badrul H. Chowdhury, Senior Member, IEEE, Jonathan W. Kim

Add to Reading List

Source URL: www.jonathankimball.com

Language: English - Date: 2011-02-15 10:45:14
204Hair removal / Waxing / Toko / Ski / Lunar phase / Waxes

WAX RECOMMENDATION Trails at Telemark Resort, Cable, WI Saturday, JanuaryA.M., last race at 1 P.M. 10K/5K/3K Classic, Individual start 5K loop

Add to Reading List

Source URL: www.tokous.com

Language: English - Date: 2016-01-21 10:05:52
205Electronic engineering / Engineering / Electronic design / Oscillators / Electronics / DBm / Phase-locked loop / Radio / Multiplexing

IDCS USERS’ GUIDE Issue 10, Version 1, October 2009 INTERNATIONAL DATA COLLECTION SYSTEM USERS’ GUIDE

Add to Reading List

Source URL: dcs2.noaa.gov

Language: English - Date: 2015-10-27 19:27:36
206

PHASE 1 „Wir planen & analysieren“ Checkliste 1- Basisdaten – Ablauforganisation 1. Erstkontakt. Nachfolgende Vorabinfos

Add to Reading List

Source URL: www.eagleeyes.ch

Language: German - Date: 2014-07-30 07:50:07
    207Land management / Water management / Natural environment / Natural resources / Natural resource management / Soil / Irrigation / Water quality

    WALKER BASIN PROJECT: PHASE II QUARTERLY REPORT Submitted to the National Fish and Wildlife Foundation for the period 1 October 2010 to 31 December 2010 by Dr. Michael W. Collopy Assistant Vice President for Research &

    Add to Reading List

    Source URL: environment.unr.edu

    Language: English - Date: 2013-06-26 19:20:54
    208Dengue fever / Microbiology / Medicine / Vaccines / Clinical medicine / Dengue vaccine / Flaviviruses / Virology / Dengue virus / Viral hemorrhagic fever / Japanese encephalitis / Eva Harris

    FOR IMMEDIATE RELEASE Contact: Dr. Elliot Parks, HAWAII BIOTECH INITIATES PHASE 1 CLINICAL TRIAL FOR DENGUE VACCINE (HONOLULU, August 25, Hawaii Biotech, Inc. President and CEO Elliot Parks, Ph.D.,

    Add to Reading List

    Source URL: www.hibiotech.com

    Language: English - Date: 2015-05-10 18:05:43
    209Real estate / Construction / Computer-aided design / Data modeling / Building engineering / Building information modeling / COBie / British Standards / BIM Task Group / BS / Construction Project Information Committee / Information Services Procurement Library

    PAS:2013 Incorporating Corrigendum No. 1 Specification for information management for the capital/delivery phase of construction projects using

    Add to Reading List

    Source URL: www.bauen-digital.ch

    Language: English
    210

    Phase 1: Projektidee und Beratung Beratungsgespräche zwischen ProjektwerberIn und LAG-Management:  Infos zu Rahmenbedingungen für LEADER-geförderte Projekte  Einordnung des Projektvorhabens in die Lokale Entwick

    Add to Reading List

    Source URL: www.sauwald-pramtal.at

    Language: German - Date: 2015-06-23 08:21:47
      UPDATE